SolidSheet® Installation Procedure
- Carefully position and mark off where SolidSheets will be applied on the road surface.
- Make sure markings are accurate and correspond to the road surface's shape/curve.
- We recommend labeling the individual parts and creating a layout guide to avoid inproper installations.
- Surface preparation and primer application on the road surface.
- Be sure to remove any and all dust, moisture, oil, etc. from the road surface.
(Failure to do so may cause the peeling problems.)
- Apply the special primer on the marked road surface.
- Position the sheet.
- After primer solvent has vaporized, precisely place the sheet(s) in the previously marked areas.
- Since individual Solidsheet patterns come in separate pieces, please refer to layout guide.
- Heating the sheet.
- Begin heating the sheet with a low flame.
- Working from the center of the sheet, remove any air from underneath the sheet.
- Next, turn the gas up and melt the sheet with sufficient heating.
(Please move gas burner back and forth to heat the sheet uniformly.)
- If you spray glass beads on the sheets after heating, nighttime reflection will be enhanced.
- Allow sheets to cool.
- After all of the above steps, please all the sheets to cool completely.
(Under high temperature conditions, water can be sprayed to complete the cooling process.)
|
|
|
|